|
|
Countertop made of Adirondack granite (in the Cold Springs Granite showroom)
|
|
|
An outdoor shower is installed on the west side of the Hut, providing us early access to water
|
|
|
The outdoor shower is made of rough copper piping, well suited to the look-and-feel of the Hut
|
|
|
Pressure tank in the utility room
|
|
|
A temporary toilet is installed for the crew
|
|
|
There is a dug well with a concrete top. This has since been raised another 4 feet.
|
|
|
In the spring, there was 9' of water in the well
|
|
|
A model of the underfloor heating system used under the wood floor
|
|
|
The floor of the outdoor shower is a pit, lined with plastic and filled with river stones
|
|
|
The outdoor shower is drained to the hillside using PVC pipe left over from the septic installation
|
|
|
The floor of the outdoor shower is drained via PVC pipe to the hillside
|
|
|
The drain pipe is covered with mesh to prevent animals from taking up shop
|
|
|
Plumbing a la Mike Morris and Sons
|